Hi,
I have a problem with node-on-links!
I build a railroad network in schematics. The rail can have a signal as node-on-link. The field REFERENCELINK in the node-on-link, in which must stand the SchematicID from the rail, is taken out from a field called “SchematicGleisID” also in the node-on-link. The generation of the schematic works great and the REFERENCELINK has the same SchematicID as well as the field “SchematicGleisID”. But when I change the SchematicID in the field “SchematicGleisID” and I update my schematic, the REFERENCELINK does not change its ID!!! What can I do so that the REFERENCELINK will change after an update?
Thanks for any help!
Christin

Reply With Quote

Bookmarks